0
Skip to Content
Wye Valley Greenway
About the Path
FAQs
Special Thanks
Visiting
Ecology
The Floral Mile
Introduction
The Story So Far
Working with the Community
History
Overview
Building the Railway
Operating the Railway
Reflections
Videos
Wireworks Bridge Refurbishment
Acknowledgments and Resources
Supplementary Material
Gallery
Volunteer
Donation
Events
Wye Valley Greenway
About the Path
FAQs
Special Thanks
Visiting
Ecology
The Floral Mile
Introduction
The Story So Far
Working with the Community
History
Overview
Building the Railway
Operating the Railway
Reflections
Videos
Wireworks Bridge Refurbishment
Acknowledgments and Resources
Supplementary Material
Gallery
Volunteer
Donation
Events
Folder: About the Path
Back
FAQs
Special Thanks
Visiting
Ecology
Folder: The Floral Mile
Back
Introduction
The Story So Far
Working with the Community
Folder: History
Back
Overview
Building the Railway
Operating the Railway
Reflections
Videos
Wireworks Bridge Refurbishment
Acknowledgments and Resources
Supplementary Material
Gallery
Volunteer
Donation
Events
  • Overview,
• 2/9/22

Overview: Part 2 The Engineers and Tidenham Tunnel

The engineers who designed and supervised the construction of the line and their challenge to build the 1000m Tidenham tunnel in hard limestone.

Previous

Overview: Part 1 The Early Years

Next

Overview: Part 3 The navvies and the Wireworks Branch

To volunteer visit our Volunteer Page

General enquiries: wyevalleygreenway@yahoo.com

For our Privacy Policy click here

For events vist our Events Page

The content published on this website is protected by copyright, and includes a number of images which have been reproduced with the kind permission of the owners. Any reproduction without consent is prohibited.